YPF Advances with Mega LNG Project in Vaca Muerta

The Argentine government has given the green light to an ambitious project aimed at producing and exporting liquefied natural gas (LNG) from the Vaca Muerta deposit, located in Neuquén province. This initiative, led by YPF in partnership with Italy's ENI and Adnoc's subsidiary XRG, represents a total investment of 50.75 billion dollars, making it the country's largest investment proposal to date.
According to Economy Minister Luis Caputo, this project not only involves a significant economic injection, but also has the potential to generate foreign currency estimated at 9 billion dollars annually through LNG exports. The plan aims to reach a production of 12 million tons per year of liquefied natural gas.
To facilitate production, a maximum capacity of 65 million cubic meters per day of gas is planned, equivalent to over 40% of Argentina's current production. This development includes the construction of a gas pipeline and a products pipeline, each 524 kilometers long, which will transport hydrocarbons to the Atlantic coast in Río Negro province, where floating liquefaction units will be installed.
Labor and Economic Impact
The construction phase will generate approximately 20,000 jobs, reaching peaks of up to 40,000 positions as the project advances. Once operations begin, around 8,000 direct and indirect jobs are expected to be maintained. These figures underscore the positive impact this investment can have on the local and national economy.
The project, which incorporates the Incentive Regime for Large Investments (RIGI), joins 30 others already approved under this scheme, which promise total investments of over 79 billion dollars in sectors such as mining and oil. With this new proposal, Vaca Muerta positions itself as a key engine for Argentine exports in the near future.
